Oregon Code § 701.335·Enacted ·Last updated March 01, 2026
Statute Text
Recommended maintenance schedule; rules.
(1) A contractor that enters into a contract to
construct a new residential structure or zero-lot-line dwelling shall provide a
recommended maintenance schedule to the property owner or original purchaser of
the proposed structure or dwelling at the time that the contractor makes a
written offer of warranty under ORS 701.320.
(2) The
Construction Contractors Board shall adopt rules describing the minimum
information that a contractor shall provide to a property owner or original
purchaser under subsection (1) of this section. The minimum information shall
include, but need not be limited to, the following:
(a) Definitions
and descriptions of moisture intrusion and water damage.
(b) An
explanation of how moisture intrusion and water damage can occur.
(c) A description
and recommended schedule for maintenance to prevent moisture intrusion.
(d) Advice on how
to recognize the signs of water damage.
(e) Appropriate
steps to take when water damage is discovered. [2007 c.648 §13; 2009 c.409 §5]