Oregon — State Statute

Oregon Revised Statutes Chapter 480 § 480.595 — Permits; rules; fees

Oregon Revised Statutes Chapter 480 ·
Oregon Code § 480.595 · Enacted · Last updated March 01, 2026
Statute Text
Permits; rules; fees. (1) The Department of Consumer and Business Services may adopt rules regarding installation permits and operating permits. The rules may include, but need not be limited to, rules creating standardized forms, establishing operating permit fees, establishing permit cycles and setting terms and conditions for permit validity. (2) Upon timely receipt of an installation permit fee, the department may issue an installation permit, perform an installation inspection and issue a temporary operating authorization. (3) Upon timely receipt of an operating permit fee, the department may issue or renew an operating permit and may perform a periodic inspection if required during the operating permit cycle. (4) Except as provided in ORS 480.525 and 480.600, installation permit fees are as follows: (a) For boilers, $175. (b) For pressure vessels, $125. (5) Except as provided in ORS 480.600, maximum operating permit fees per year are as follows: (a)    Power boilers of 15 horsepower or less                                                         $110 (b)    Other boilers of 15 horsepower or less                                                         $ 55 (c)    Power boilers greater than 15 horsepower to 100 horsepower                  $110 (d)    Other boilers greater than 15 horsepower to 100 horsepower                  $ 55 (e)    Power boilers greater than 100 horsepower to 500 horsepower                  $110 (f)     Other boilers greater than 100 horsepower to 500 horsepower                  $ 55 (g)    Power boilers greater than 500 horsepower                                  $110 (h)    Other boilers greater than 500 horsepower                                  $ 55 (i)     Notwithstanding paragraphs (a) to (h) of this subsection, all cast iron boilers                                     $ 55 (j)     Pressure vessels having a product volume of 20 cubic feet or less                                   $ 50 (k)    Pressure vessels having a product volume greater than 20 cubic feet                           $ 50 (6) For a reinspection, the fee is $75. (7) For the submission of plans and other pertinent data when required, for each boiler or pressure vessel, the fee is $78. [1961 c.485 §19; 1967 c.447 §3; 1969 c.582 §16; 1973 c.830 §6; 1973 c.832 §18a; 1974 c.36 §17; 1981 c.566 §2; 1983 c.676 §16; 1991 c.201 §3; 2001 c.162 §1; 2007 c.487 §9; 2009 c.696 §17]
Plain English Explanation
This Oregon statute addresses Permits; rules; fees. AI-powered analysis coming soon.
Key Points
Frequently Asked Questions
This section of Oregon law addresses Permits; rules; fees. Read the full statute text above for details.
This page reflects the current text as of our last update. Always verify with the official Oregon legislature website for the most current version.
The formal citation is Oregon Code § 480.595. Use this format in legal documents and court filings.
Browse related sections using the links below, or search all Oregon statutes on FlawFinder.
Why Attorneys Choose FlawFinder

Why Attorneys Choose FlawFinder

Side-by-side with Westlaw and LexisNexis

Feature FlawFinder Westlaw LexisNexis
Monthly price $19 – $99 $133 – $646 $153 – $399
Contract None 1–3 year min 1–6 year min
Hidden fees $0, always Up to $469/search $25/mo + per-doc
Police SOPs 310+ departments No No
Plain-English ELI5 Included No No
Cancel One click Termination fees Account friction
Related Sections

Full legal research for $19/month

All 50 states · Federal regulations · Case law · Police SOPs · AI analysis included · No contract

Continue Researching →