Oregon — State Statute

Oregon Revised Statutes Chapter 479 § 479.570 — Energizing of electrical installations; rules

Oregon Revised Statutes Chapter 479 ·
Oregon Code § 479.570 · Enacted · Last updated March 01, 2026
Statute Text
Energizing of electrical installations; rules. (1) Except as provided in subsection (2) of this section, a person who sells electricity may not energize an electrical installation unless the installation is first approved by an inspector authorized to perform inspections under ORS 479.510 to 479.945. (2) Subsection (1) of this section does not apply to: (a) An installation for which a written request to energize has been made by a licensed supervising electrician qualified pursuant to ORS 479.630 (2) and to which the appropriate electrical permit has been attached; (b) A temporary installation of less than 480 volts made to provide service to a construction site or irrigation pump if the installation is properly grounded and the appropriate electrical permit is attached thereto; (c) An installation within a plant or system of a person who sells electricity. As used in this paragraph, “person who sells electricity” does not include small power production facilities as defined in ORS 758.500 (1981 Replacement Part); or (d) A minor electrical installation for which a valid installation label has been issued. (3) Electrical installations energized without inspection pursuant to subsection (2)(a) and (b) of this section must receive final inspection as required by ORS 479.510 to 479.945. (4) Notwithstanding ORS 756.040, 756.060 and 757.035, the Department of Consumer and Business Services, in consultation with the Electrical and Elevator Board, may adopt rules regulating the use of a written request by a licensed supervising electrician as described in subsection (2)(a) of this section as adequate authority for a person who sells electricity to energize an electrical installation. [1959 c.406 §8; 1981 c.815 §11; 1983 c.580 §1; 1987 c.575 §6; 2003 c.14 §324; 2007 c.405 §1]
Plain English Explanation
This Oregon statute addresses Energizing of electrical installations; rules. AI-powered analysis coming soon.
Key Points
Frequently Asked Questions
This section of Oregon law addresses Energizing of electrical installations; rules. Read the full statute text above for details.
This page reflects the current text as of our last update. Always verify with the official Oregon legislature website for the most current version.
The formal citation is Oregon Code § 479.570. Use this format in legal documents and court filings.
Browse related sections using the links below, or search all Oregon statutes on FlawFinder.
Why Attorneys Choose FlawFinder

Why Attorneys Choose FlawFinder

Side-by-side with Westlaw and LexisNexis

Feature FlawFinder Westlaw LexisNexis
Monthly price $19 – $99 $133 – $646 $153 – $399
Contract None 1–3 year min 1–6 year min
Hidden fees $0, always Up to $469/search $25/mo + per-doc
Police SOPs 310+ departments No No
Plain-English ELI5 Included No No
Cancel One click Termination fees Account friction
Related Sections

Full legal research for $19/month

All 50 states · Federal regulations · Case law · Police SOPs · AI analysis included · No contract

Continue Researching →