Oregon Revised Statutes Chapter 455 § 455.815 — Establishment of master builder programs; waiver of inspections; builder
Oregon Revised Statutes Chapter 455 ·
Oregon Code § 455.815·Enacted ·Last updated March 01, 2026
Statute Text
Establishment of master builder programs; waiver of inspections; builder
verification of performance.
(1) Local government establishment of a master builder program is voluntary. A
local government electing to establish or terminate a program shall notify the
Department of Consumer and Business Services. If terminating a program, the
local government must give the notice six months before the program terminates.
(2) The
Department of Consumer and Business Services may implement a master builder
program in one or more geographic areas for which the department provides plan
review or inspection services. A department decision to include an area as a
participant in the program affects only those areas, and those reviews or
inspections, for which the department provides services instead of a local
government. The department shall notify a county prior to implementing a master
builder program in areas of the county that are served by the department.
(3) A local
government may not allow an individual to perform the duties of a master
builder unless the local government has a master builder program. The
department may allow an individual to perform the duties of a master builder in
any geographic area administered by the department.
(4) A building
official of a government having a master builder program may waive plan review
elements by that government and may waive government performance of one or more
of the required inspections identified by department rule, including but not
limited to inspections described in subsection (6) of this section, if:
(a) An individual
certified as a master builder submits construction plans for a one or two
family dwelling regulated by the Low-Rise Residential Dwelling Code; and
(b) The building
official determines that:
(A) The work is
not of a highly technical nature; and
(B) There is no
unreasonable potential risk to safety of the structure.
(5) A building
official may not waive government performance of plan review or required
inspections for:
(a) Special
design applications that are complex and highly technical engineered systems;
or
(b) Unique
building sites, including but not limited to sites containing geologic hazards
such as landslide hazard areas, floodplains and wetlands.
(6) Subject to
subsections (3) to (5) of this section, a building official may allow a master
builder to verify that the master builder has properly performed an
installation on a project and, to the extent that inspection would duplicate
the verification conducted by the master builder, may waive government
performance of the following required inspections:
(a) Drywall;
(b) Footings and
setbacks;
(c) Foundation
walls, Ufer grounding rods and rebar;
(d) Insulation;
(e) Masonry
fireplace pre-cover;
(f) Masonry
rebar;
(g) Gutters,
downspouts and foundation drains;
(h) Roof
sheathing nailing;
(i) Suspended
ceilings;
(j) Underfloor
structural; and
(k) Wall
sheathing nailing. [2001 c.406 §4; 2003 c.675 §40]
Note:
See note under 455.800.
Plain English Explanation
This Oregon statute addresses Establishment of master builder programs; waiver of inspections; builder
. AI-powered analysis coming soon.
Key Points
01Part of Oregon statutory law
02Referenced as Oregon Code § 455.815
03Subject to legislative amendments
04Consult a licensed attorney for application to specific cases
Frequently Asked Questions
This section of Oregon law addresses Establishment of master builder programs; waiver of inspections; builder
. Read the full statute text above for details.
This page reflects the current text as of our last update. Always verify with the official Oregon legislature website for the most current version.
The formal citation is Oregon Code § 455.815. Use this format in legal documents and court filings.
Browse related sections using the links below, or search all Oregon statutes on FlawFinder.