Oregon Revised Statutes Chapter 450 § 450.825 — Plan
Oregon Revised Statutes Chapter 450 ·
Oregon Code § 450.825·Enacted ·Last updated March 01, 2026
Statute Text
Plan
for sewage disposal and drainage to be developed by authority.
As soon as practicable after the
election of the first members of the board, the board shall make a study and
survey of the existing sewage disposal facilities and systems in the authority
and of its sewage disposal needs, both present and future, and prepare an
overall coordinated plan for the authority which incorporates, so far as
practicable, existing sewage disposal and drainage systems, future sewage
treatment plants, including connecting trunk and lateral sewers, and future
drainage systems. Such plan shall be revised from time to time as circumstances
may require. In preparing the plan or revisions thereto, the board shall take
into consideration expected fluctuations in population and in business and
industrial activity. [1955 c.614 §28]
Plain English Explanation
This Oregon statute addresses Plan
. AI-powered analysis coming soon.
Key Points
01Part of Oregon statutory law
02Referenced as Oregon Code § 450.825
03Subject to legislative amendments
04Consult a licensed attorney for application to specific cases
Frequently Asked Questions
This section of Oregon law addresses Plan
. Read the full statute text above for details.
This page reflects the current text as of our last update. Always verify with the official Oregon legislature website for the most current version.
The formal citation is Oregon Code § 450.825. Use this format in legal documents and court filings.
Browse related sections using the links below, or search all Oregon statutes on FlawFinder.